Iconic Projects

Trusted on Singapore landmarks

Firestop, expansion joint, sealant and façade works for leading architects, façade consultants and main contractors — from Marina One to Yale-NUS.

21 projects

Ongoing

SingTel Telephone Exchanges (Data Centres)

Re-instatement of fire-stop penetrations — STI SpecSeal AS200 / Composite Sheet / LCI; STI EZ-Path for cable penetrations

Firestop
Key parties

Client: Singapore Telecommunications Ltd
Authorised Service Contractor
Sites: Ang Mo Kio, Jurong, Jurong East, Jurong West, Tuas, Changi, Paya Lebar, Central, Pasir Ris, Telok Blangah, Tampines

2019

Two Nine Six O Trading @ 21 Tuas

Painting, performance coating, window glass replacement, solar film, space planning, carpentry and interior works

CoatingsFaçade/GlassA&A / Metal Works
Key parties

Owner/Client: Two Nine Six O Trading Pte Ltd
Main Contractor: ZGG Pte Ltd

2019

NUS Institute of Systems Science

Curtain wall and façade A&A works; STI firestop systems

Façade/GlassFirestop
Key parties

Architect: AWP Pte Ltd
MC/Client: Gennal Industries Pte Ltd

2019

Thomson-East Coast Line — Mandai Depot

Steel works; STI firestop systems

FirestopA&A / Metal Works
Key parties

Owner: Land Transport Authority
MC/Client: Jurong Primewide Pte Ltd

2018

Sengkang General Hospital

STI SpecSeal AS200 perimeter fire barrier (precast panels to slab); SHARPIE / VAROSEAL sealant to precast panels

FirestopSealants
Key parties

Architect: DP Architects
Façade: Building Façade Group
MC: Penta-Ocean Construction
Clients: Penta-Ocean, Sinstar Precast

2017

JTC Space @ Tuas

VEDAFrance BAE waterstop; KM expansion joint; GE Momentive Tosseal 817 control joint

Expansion JointsSealants
Key parties

Architect: SAA Architects
MC/Client: Tiong Seng Contractors

2017

DUO Hotel & Residences @ Rochor–Ophir

STI SpecSeal AS200 / Fast Tack / CS Composite Sheet perimeter fire barrier to external façade

Firestop
Key parties

Architect: Architects 61
Façade: ALT Limited
MC: Obayashi Singapore
Client: Jangho Group (SG Branch)

2017

Marina One @ Marina Boulevard

STI SpecSeal AS200 perimeter fire barrier; VEDAFEU N firestop blanket for expansion joints; SHARPIE MEGAHARD One control joints

FirestopExpansion JointsSealants
Key parties

Architect: Architects 61
Façade: Arup Singapore
MC: Hyundai–GS JV
Clients: Hyundai–GS JV, Yuanda Curtainwall, Earth Art

2017

Micron Fab 10X

STI SpecSeal LCI and CS Composite Sheet intumescent system to penetrations

Firestop
Key parties

MC/Client: M+W Group

2017

Our Tampines Hub

Link-bridge expansion joints: VEDAFEU C firestop; VEDAFrance expansion joint systems

Expansion JointsFirestop
Key parties

Architect: DP Architects
MC/Client: Hexacon Construction

2017

V on Shenton

KM expansion joints to link bridges; STI SpecSeal AS200 perimeter fire barrier

Expansion JointsFirestop
Key parties

Architect: Architects 61
MC: Samsung C&T
Clients: Samsung C&T, Jangho Group

2016

National Centre for Infectious Diseases (NCID)

VEDAFrance expansion system for link bridges; SHARPIE MEGAHARD One control joints; VEDAFEU C firestop backer rod

Expansion JointsSealantsFirestop
Key parties

MC/Client: Kajima Overseas Asia

2016

Eden Residences Capitol

STI SpecSeal AS200 perimeter fire barrier

Firestop
Key parties

Architect: Architects 61
Façade: Arup Façade Engineering
MC: Shimizu Corporation
Client: Jangho Group

2016

Mediacorp Campus @ Mediapolis, one-north

STI SpecSeal AS200 perimeter fire barrier

Firestop
Key parties

Architect: DP Architects with Maki and Associates (Japan)
Façade: BFG
MC: Kajima–Tiong Seng JV
Client: YKK AP

2015

JTC Food Hub @ Buroh Lane

VEDAFrance expansion system

Expansion Joints
Key parties

Design Architect: UNStudio
Project Architect: Surbana Jurong
MC/Client: HPC Builders

2015

Yale-NUS College

VEDAFrance expansion joints; STI SpecSeal AS200 for construction and expansion joints

Expansion JointsFirestop
Key parties

Design Architect: Pelli Clarke Pelli
Project Architect: Forum Architects
Façade: Arup
C&S: Meinhardt
Client: Ssangyong E&C

2015

SUTD — Plot A

VEDAFrance expansion system for link bridges

Expansion Joints
Key parties

Design Architect: UNStudio
Project Architect: DP Architects
C&S: Parsons Brinckerhoff
Client: Kajima Overseas Asia

2015

NUS MD1 — Yong Loo Lin School of Medicine

STI SpecSeal AS200 / Composite Sheet / ES perimeter fire barrier to façade cladding

Firestop
Key parties

Design Architect: RMJM New York
Project Architect: CPG Consultants
Façade: BFG
MC: Kajima
Client: Jangho Group

2015

Eight Riversuites @ Boon Keng

STI SpecSeal AS200 perimeter fire barrier to façade cladding

Firestop
Key parties

Project Architect: CPG Consultants
MC: Daewoo E&C
Client: Jangho Group

2014

SIM Phase 2 Campus Extension

STI SpecSeal AS200 perimeter fire barrier to precast panels

Firestop
Key parties

Architect: Architects 61
Façade: Meinhardt
Client: Tiong Seng Contractors

2014

NTUC FairPrice Hub @ Joo Koon Circle

STI SpecSeal Fast Tack perimeter fire barrier to façade catwalk

Firestop
Key parties

Architect: ADDP Architects
Client: Tiong Seng Contractors

Years of experience
0 +
Iconic projects
0 +
Authorised product partners
0
SingTel exchanges serviced
0

FAQ

Frequently asked questions

ZGG has delivered 20+ iconic projects in Singapore, plus ongoing firestop work at 11 SingTel telephone exchanges.

Hospitals, universities, commercial towers, residences, data centres, rail depots and industrial facilities.

Ang Mo Kio, Jurong, Jurong East, Jurong West, Tuas, Changi, Paya Lebar, Central, Pasir Ris, Telok Blangah and Tampines.

Your project could be next

Tell us about your specification and programme — we will get back to you promptly.
Your Trusted Installer. Singapore specialist contractor for firestop, expansion joints, sealants, performance coatings, façade and building rectification works.
© 2026 ZGG Pte Ltd. All rights reserved.
Authorised Installer: STI · VEDAFrance · SHARPIE · Momentive  |  Products supplied by sister company Two Nine Six O Trading
WhatsApp us